Can the application also do timing calculation and Pre-Signal integrity analysis?

24 January 2016

Timing calculations : Yes.  In the beta version of the application the layout help document contains the the various signal and clock routing constraints for peripheral connections. For reset, power generation and distribution timing calculations are done to ensure that it meets the circuit requirement. It does not generate separate timing information in any document.

Pre-Signal integrity information: No. It is highly recommended that the pre signal integrity analysis be performed on the design generated by application.

Was this answer helpful ? Yes (0) / No (0)